Stoplog Replacement, Fort Peck Dam
Project Summary: This contract for the USACE involved the removal of the existing stoplogs, fabrication of new draft tube stoplogs, lifting beam and installation of the stoplogs and lifting beam. MDS self-performed the removal and installations as well as the replacement of the dogging devices and testing of the new stoplogs.
