Upper Beaver Brook Dam Outlet Works Modification Project
Project Summary: Marine Diving Solutions was awarded this contract which involved water diversion, sliplining the existing outlet works conduit with HDPE pipe, demolishing the existing intake structure, installing a new structure with trash rack and connecting the new HDPE pipes to the new intake structure. This contract also included installing a new hydraulically actuated intake gate, vent pipe, hydraulic lines, HDPE carrier pipe and constructing a new HPU building, HPU unit for gate and solar power.